​Custom IPE dock, floating dock, custom ceiling

Sullivans Island, SC

 

Custom IPE dock, boat lift with step out, floating dock

Kiawah Island, SC

J.B- Kiawah Island

​Blutide Marine just completed a major reconstruction of our pier.  They built a new floating pier, installed a boat lift, replaced numerous pilings, and installed new IPE decking and handrails with stainless steel cables underneath.  In addition, new water and electrical services were installed.  The work was completed on time, and on budget.  More impressive, however, was the tremendous attention to detail and the great pride that they take in their work. The pier is beautiful.  I would recommend them, without reservation, to anyone requiring marine construction work.

RIp-Rap, Beach Walkway, Bulkhead

Greater Charleston Area

​Our experience working with Blutide Marine was nothing short than exceptional! We installed a retaining wall and dock with a covered pier head and floating dock.  Both turned out beautifully, on time and on budget.  Karl even came back and made some post construction adjustments that were outside of the original scope at no charge and always made sure that we felt great about the project.  Blutide Marine worked hard to coordinate the necessary elements of DHEC compliance and our project, making a potentially bureaucratic process much more tolerable.  Believe me, that is very valuable when entering the marine permitting process. In short, my wife and I would recommend Blutide Marine Construction without one bit of reservation, a truly professional outfit!

Mr. Tony Brush, Mt. Pleasant

 

 

Folly Beach County Park Dune Replacement

Folly Beach County Park, Folly Beach, SC

Karl and his crew were dedicated, hardworking, creative, and confident in the face of this huge task of rebuilding the dunes along the entire length of the park.  They worked as a crew, often forced into split shifts due to the changing tides.  They worked tirelessly, daily often until there were simply no light.There were numerous setbacks caused by the weather and the tides.  Karl and his crew faced these challenges with a positive attitude and willingness to complete the task without complaint. I would highly recommend this firm to complete construction services of this kind in the future.

Ms. Cynthia Montegue, Director, Capital Projects Division, Charleston County Parks and Recreation