Opens in a new tab
Charleston-based · Building across the Southeast
Private residential dock on a Lowcountry creek
Waterfront homes

Residential Marine Construction

Custom docks, boat lifts, seawalls and hardwood pier heads for Lowcountry waterfront homes — guided from permitting to the last board, and built to stand up to salt, storms and tide.

Permitting to constructionDriven pilesCharleston & the Lowcountry
From permitting to construction

Function and beauty for your waterfront investment

We start on your dock or bulkhead line, not in an office. We will design around your water depth, tide range and the way you use the water, then guide you through the permitting process, construction and maintenance.

We combine decades on the coastal waters with fresh ideas and craftsmanship to make waterfront living better — more useful, more durable and better looking.

  • Docks, slips & boat lifts
  • Seawalls, bulkheads & rip-rap
  • Custom hardwood construction
  • Repairs, re-decking & storm damage
Residential dock and pier head over the marsh
24+Years experience
1,000+Projects completed
16+Public & community clients
1Team, permit to punch list
How it works

Your project, start to finish

Site visit

We walk the property, check depth and tide, and talk through how you use the water.

Design & price

A layout and a clear, line-item proposal — materials, lift, power and water included.

Permits

We prepare and guide the SCDES/OCRM and Army Corps applications and any HOA/POA review.

Build

Driven piles, framing, decking and lift installation by our own crews, then a final walkthrough.

Client feedback

What our clients say

They have built three piers, a massive seawall, and a beautiful boat house for us. Their work is on budget and executed to the highest standards. And they are always available after the fact for enhancements or maintenance.
JohnHomeowner, Wadmalaw Island
I have used BluTide Marine for two projects in the last year and have been very pleased with both outcomes. BluTide’s ability to produce, manage and maintain schedule, cost, quality, attention to detail as well as communication and problem solve are some of their strengths.
George S. HeylConstruction Manager, The Beach Company
FAQ

Frequently asked questions

Most of the timeline is permitting. Once permits are issued, construction of a typical private dock takes a few weeks depending on length, pier head size and lift. We give you a realistic schedule at the proposal stage.

Almost always. Docks and bulkheads in tidal critical areas need state (SCDES/OCRM) approval and often a U.S. Army Corps of Engineers authorization, plus any HOA or POA review. We guide the process for you.

Marine-grade treated pilings driven to refusal, coastal-grade hardware and your choice of decking — treated pine, hardwoods or composite. We’ll explain the tradeoffs for salt water and sun.

Yes. We repair, re-deck and rebuild existing docks and seawalls, including storm damage. See waterfront repair & restoration.

Get started

Tell us about your waterfront

Share your address, what you’d like to build and any photos. We’ll follow up within one business day.

Office3771 Belvedere Rd., Johns Island, SC 29455
HoursMonday–Friday, 9:00 am–5:00 pm

Loading the project inquiry form… or call (843) 557-1595.